Dual-key block tracking
Drawing number + block number compound index, locate any block across workshops and processes.
From block fabrication, grand-block assembly, on-berth, closure to undocking — every milestone tracked with the same four-layer data architecture.
Use the same MC / Punch / inspection methodology proven in Electrical to manage the hull. Progress and quality, finally on separate axes.
●This discipline is in early-access recruitment — same methodology and data model as the live Electrical module. Join us to shape it.
Workshop pre-fabrication, indexed by both drawing number and block number
Blocks joined into grand-blocks, key nodes go through MC inspection
Grand-block lifted onto the berth, milestone PlanDate triggers AT RISK warning
Full hull closure milestone, maps to the structural subsystem RFCC
Undocking / launch milestone — the key delivery point for structure
Class surveyor sign-off, status flips to Cleared once all Punch items close
Drawing number + block number compound index, locate any block across workshops and processes.
Auto-flagged red when PlanDate ≤ 14 days and progress < 80% — same rule as Electrical.
Weld defects flow into the Punch module; A-class blocks RFCC. Same grading as Electrical.
Class-surveyor daily inspections go through PAT, decoupled from MC — defects stay clean.
Structural progress, weld defects, milestone warnings — runs on the same AI engine as Electrical.
Drawing number deeply integrated with the Drawing module — one revision traces through every MC/Punch record.
Discipline scenario mockup · replaced post-launch
Structural part in/out wired to warehouse; block progress drives material readiness rate.
Drawing number is the structural-part key — revisions pierce every MC/Punch record.
Structural RFCC READY is the prerequisite for electrical commissioning. Status linked, no idle waiting.