Electrical · FAT Acceptance

The digital archive of factory acceptance

Factory Acceptance Test, 18 fields, with vendor info and acceptance conclusion.

Standalone loop, does not affect RFCC — purpose-built for complete archival of vendor acceptance records and opinions.

Acceptance flow

  1. 1

    Vendor commissioning

    Supplier completes acceptance in-shop or on-site

  2. 2

    Enter FAT record

    18 fields including VendorName, VendorContact, etc.

  3. 3

    Acceptance conclusion

    Passed / Conditional / Failed — three-grade outcome

  4. 4

    Track opinions

    Vendor commitments tracked open/close independently

  5. 5

    Archive & retrieve

    Search by TagNo / VendorName / acceptance date; export supported

Core capabilities

Fully independent of MC

FAT is not linked to MC and does not affect RFCC — a pure vendor acceptance record.

Complete vendor info

VendorName, VendorContact, VendorRepresentative — every key piece of vendor data captured.

Three-grade conclusion

Passed / Conditional / Failed — explicit three grades, no fuzzy wording.

Independent opinion tracking

Vendor commitments tracked open/closed independently, fully decoupled from Punch.

Search by vendor

Aggregate by VendorName for project settlement and vendor KPI.

The digital archive of factory acceptance

Real product screenshot · H588 NORSE WIND is near delivery; this module's work is fully closed-out (see Punch List and the AI Weekly Report for evidence)

Data model (selected fields)

Full 18 fields; selected ones shown here.

FieldDescriptionNote
FatNoAcceptance numberUnique
TagNoLinked equipmentRequired · dropdown
VendorNameVendor nameRequired · dropdown
VendorRepresentativeVendor representativeSign-off field
AcceptanceDateAcceptance dateRequired
AcceptanceResultPassed / Conditional / FailedDrives conclusion bucket
AttachmentUrlAcceptance report attachmentOSS link