Fully independent of MC
FAT is not linked to MC and does not affect RFCC — a pure vendor acceptance record.
Factory Acceptance Test, 18 fields, with vendor info and acceptance conclusion.
Standalone loop, does not affect RFCC — purpose-built for complete archival of vendor acceptance records and opinions.
Supplier completes acceptance in-shop or on-site
18 fields including VendorName, VendorContact, etc.
Passed / Conditional / Failed — three-grade outcome
Vendor commitments tracked open/close independently
Search by TagNo / VendorName / acceptance date; export supported
FAT is not linked to MC and does not affect RFCC — a pure vendor acceptance record.
VendorName, VendorContact, VendorRepresentative — every key piece of vendor data captured.
Passed / Conditional / Failed — explicit three grades, no fuzzy wording.
Vendor commitments tracked open/closed independently, fully decoupled from Punch.
Aggregate by VendorName for project settlement and vendor KPI.

Real product screenshot · live production build, ship identifiers redacted
Full 18 fields; selected ones shown here.
| Field | Description | Note |
|---|---|---|
| FatNo | Acceptance number | Unique |
| TagNo | Linked equipment | Required · dropdown |
| VendorName | Vendor name | Required · dropdown |
| VendorRepresentative | Vendor representative | Sign-off field |
| AcceptanceDate | Acceptance date | Required |
| AcceptanceResult | Passed / Conditional / Failed | Drives conclusion bucket |
| AttachmentUrl | Acceptance report attachment | OSS link |
Covers MC inspection for every electrical equipment & cable; subsystem RFCC aggregated live, punch categories synced automatically.
Every Punch item bound to an owner + due date, AgingDays color-graded, closure state feeds back into MC instantly.
17-field patrol inspection record, independent of MC, open/close opinion tracking — the standard intake for defects found on patrol.
Drafts the weekly progress report, with week-over-week trends, from the platform's own figures using an AI model from Anthropic. AI output can be incomplete or wrong, so the team reviews and edits it before it goes out.