Electrical · PAT Inspection

The standard intake for install-phase defects

Pre-Acceptance Test inspection, 17 fields, independent of MC, does not affect RFCC.

Supports Word inspection-report upload, opinions tracked open/close, fully decoupled from the Punch path.

Inspection flow

  1. 1

    On-site inspection

    Quality check on installed equipment/cable before commissioning

  2. 2

    Upload Word report

    Upload the Word inspection sheet as an evidence attachment

  3. 3

    Enter PAT record

    17 fields, independent of MC, no MC ID link

  4. 4

    Track opinions

    Each opinion has its own open/close status

  5. 5

    Rectification follow-up

    Close opinions after rectification — does not trigger RFCC recompute

Core capabilities

Fully independent of MC

PAT is not linked to MC and does not affect RFCC — a pure install-phase quality record.

17 pre-defined fields

Fields are fixed, no configuration; aligned with the on-site Word inspection sheet.

Word file upload

Upload the original Word inspection sheet as evidence; stored as OSS link.

Independent opinion lifecycle

Each opinion is tracked open/closed independently, fully decoupled from Punch.

Import dry-run

Preview Excel uploads — new/update/skip — before any write.

The standard intake for install-phase defects

Real product screenshot · H588 NORSE WIND is near delivery; this module's work is fully closed-out (see Punch List and the AI Weekly Report for evidence)

Data model (selected fields)

Full 17 fields; selected ones shown here.

FieldDescriptionNote
PatNoInspection numberUnique
TagNoLinked equipment/cableRequired · dropdown
InspectionDateInspection dateRequired
InspectorInspectorRequired
DescriptionOpinion descriptionSupports multiple
StatusOpen / ClosedOpinion status
AttachmentUrlWord report OSS linkAttachment